Käännös


+86-371-67829333

Uutiset

Telecom Egypt käyttää 2African sukellusvenekaapelijärjestelmää

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1)

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1).

According to the introduction, EMIC-1 will land in Las Galeb in the Red Sea and Port Said in the Mediterranean, with the two landing stations connected by two different land routes. The new path is adjacent to the Suez Canal (between Suez and Port Said).

Lisäksi, Telecom Egypt is developing a third new sea lane, the Red Sea Festoon, connecting Las Galeb and the Suez landing station, while considering a land link between Port Said and Suez along the Suez Canal – Al Morshedeen System.

When completed, the 45,000-kilometer 2Africa submarine fiber optic network system is expected to be the longest submarine network in the world, yhdistäminen 46 locations in Africa, Europe and Asia.

The system is expected to come online in 2023/2024, with key parts of the system designed to have a capacity of 180Tbps.

2Arica fiber optic system

The 2Africa submarine cable is a collaboration between China Mobile International Corporation, Facebook, MTN Global Connect, Orange, STC, Telecom Egypt, Vodafone and WIOCC (East Coast Cable Consortium).

It is the most comprehensive submarine cable serving the African continent and the Middle East, and will also link East Africa and other submarine cables, expanding connections to Asia.

The 2Africa submarine cable has a total length of 37,000 kilometers and will connect Europe (through Egypt to the east), Lähi-idässä (through Saudi Arabia) ja 16 African countries (Congo, Côte d’Ivoire, Djibouti, Congo, Egypt, Gabon, Ghana, Kenya, Madagascar, 21 landing sites in Mozambique, Nigeria, Sudan, Senegal, Somalia, Tanzania and South Africa), is one of the largest submarine cable projects in the world.

2Africa provides much-needed internet capacity and reliability across much of Africa, compensating for rapidly growing capacity needs in the Middle East and supporting further growth in 5G and fixed broadband access.

According to plans, the project will be completed and commissioned in late 2023 or early 2024, and upon delivery will provide the continent with “significantly higher” capacity than all current existing cables combined.

ZMS-kaapeli F

Recent Posts

Lääkekuituoptiikan markkinoiden vahva kysyntätrendi Euroopassa

Euroopan lääketeollisuus on viime vuosina edistynyt merkittävästi, driven by the integration

3 weeks ago

Mitä teollisuuskaapeleita käytetään raketin laukaisussa alusta loppuun?

Raketin onnistunut laukaisu sisältää yhden monimutkaisimmista kuviteltavissa olevista teknisistä saavutuksista,…

1 month ago

Mitä kuituoptisia materiaaleja käytetään kuituoptisen kaapelin valmistukseen?

Kuituoptisista kaapeleista on tullut nykyaikaisen televiestinnän selkäranka, offering high-speed data transmission over

1 month ago

Kuinka monta sydäntä on korkeajännitekuparikaapeleita normaalisti? Mitä ovat sovellukset?

Korkeajännitteiset kuparikaapelit ovat olennaisia ​​komponentteja sähkövoiman jakelussa ja siirrossa,…

2 months ago

Mitä suurjännitelinjoja käytetään rautatiejärjestelmässä?

Railroad high voltage lines play a vital role in powering the railway systems that transport

3 months ago

Mikä on ero yksimuotoisten ja monimuotoisten kuituoptisten kaapelien välillä??

Kuituoptiset kaapelit ovat kriittisiä komponentteja nykyaikaisissa viestintäverkoissa, enabling high-speed data transmission over

3 months ago