The Most Advanced Submarine Cable Laying Vessel in The WorldLeonardo Da Vinci

This is a new Prysmian asset that will add to the strength of the existing Prysmian submarine cable vessel laying fleet, enabling it to work more efficiently in green energy system development projects around the world.

submarine cable laying vessel — Leonardo de Vinci

This is a new Prysmian asset that will add to the strength of the existing Prysmian submarine cable vessel laying fleet, enabling it to work more efficiently in green energy system development projects around the world.

The new vessel’s first task is to lay the Viking Link submarine cable between the UK and Denmark, the world’s longest high-voltage direct current subsea power connection.

Later this year, the vessel will be used in projects such as the underwater link between the Spanish islands of Lanzarote and Fuerteventura and the French offshore wind farm in Saint-Nazaire.

The submarine cable laying vessel is about 170m long and 34 m wide and is capable of deep water operations at depths of over 3000 m.

It is specially designed to use only marine diesel oil with a sulfur content below 0.1%, complies with the latest requirements of IMO 2020 (sulfur content <0.5%) and ECA (sulfur content <0.1%), and can sail without geographical restrictions.

I tillegg, the vessel is equipped with over 80% more powerful lighting and low-consumption LED lights, so reducing generator emissions.

Leonardo de Vinci

Thanks to next-generation cable technology, the vessel is armored with lighter materials.

The maximum speed is just over 16 knots; with 7,000-ton and 10,000-ton turntables, ensuring the highest turntable capacity on the market, reducing travel from factory to site.


The overall increase in project efficiency with two independent laying lines for increased operational flexibility.

And a bollard pull of over 180 tons with the ability to perform complex installation operations and support a variety of laying tools.

Samtidig, the ship is equipped with a state-of-the-art DP3 positioning and seakeeping system.

All cable handling and installation equipment are designed by Prysmian.

The reduction in required transit time results in an overall reduction in CO2 emissions and fuel consumption of around 40% compared to conventional cable laying vessels.

ZMS Cable F

Recent Posts

Sterk etterspørselstrend for medisinsk fiberoptikkmarked i Europa

Den europeiske medisinske industrien har vært vitne til betydelige fremskritt de siste årene, driven by the integration

3 weeks ago

Hvilke industrikabler brukes i en rakettoppskyting fra start til slutt?

Den vellykkede oppskytingen av en rakett innebærer en av de mest komplekse ingeniørbragdene man kan tenke seg,…

1 month ago

Hvilke fiberoptiske materialer brukes til å produsere en fiberoptisk kabel?

Fiberoptiske kabler har blitt ryggraden i moderne telekommunikasjon, offering high-speed data transmission over

1 month ago

Hvor mange kjerner er høyspentkobberkablene normalt? Hva er applikasjonene?

Høyspent kobberkabler er essensielle komponenter i distribusjon og overføring av elektrisk kraft,…

2 months ago

What Are the High Voltage Lines Used in the Railroad System?

Railroad high voltage lines play a vital role in powering the railway systems that transport

3 months ago

What is the Difference Between Single-Mode and Multimode Fiber Optic Cables?

Fiber optic cables are critical components in modern communication networks, enabling high-speed data transmission over

3 months ago