Traducere


+86-371-67829333

News

Telecom Egypt to Access 2Africa Submarine Cable System

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1)

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1).

According to the introduction, EMIC-1 will land in Las Galeb in the Red Sea and Port Said in the Mediterranean, with the two landing stations connected by two different land routes. The new path is adjacent to the Suez Canal (between Suez and Port Said).

In addition, Telecom Egypt is developing a third new sea lane, the Red Sea Festoon, connecting Las Galeb and the Suez landing station, while considering a land link between Port Said and Suez along the Suez Canal – Al Morshedeen System.

When completed, the 45,000-kilometer 2Africa submarine fiber optic network system is expected to be the longest submarine network in the world, connecting 46 locations in Africa, Europe and Asia.

The system is expected to come online in 2023/2024, with key parts of the system designed to have a capacity of 180Tbps.

2Arica fiber optic system

The 2Africa submarine cable is a collaboration between China Mobile International Corporation, Facebook, MTN Global Connect, Orange, STC, Telecom Egypt, Vodafone and WIOCC (East Coast Cable Consortium).

It is the most comprehensive submarine cable serving the African continent and the Middle East, and will also link East Africa and other submarine cables, expanding connections to Asia.

The 2Africa submarine cable has a total length of 37,000 kilometers and will connect Europe (through Egypt to the east), the Middle East (through Saudi Arabia) and 16 African countries (Congo, Côte d’Ivoire, Djibouti, Congo, Egypt, Gabon, Ghana, Kenya, Madagascar, 21 landing sites in Mozambique, Nigeria, Sudan, Senegal, Somalia, Tanzania and South Africa), is one of the largest submarine cable projects in the world.

2Africa provides much-needed internet capacity and reliability across much of Africa, compensating for rapidly growing capacity needs in the Middle East and supporting further growth in 5G and fixed broadband access.

According to plans, the project will be completed and commissioned in late 2023 or early 2024, and upon delivery will provide the continent with “significantly higher” capacity than all current existing cables combined.

ZMS Cable F

Recent Posts

Strong Demand Trend for Medical Fiber Optics Market in Europe

The European medical industry has witnessed significant advancements in recent years, driven by the integration

3 weeks ago

What Industry Cables Are Used in a Rocket Launch from Start to Finish?

The successful launch of a rocket involves one of the most complex engineering feats imaginable,…

1 month ago

What Fiber Optic Materials Are Used to Produce a Fiber Optic Cable?

Fiber optic cables have become the backbone of modern telecommunications, offering high-speed data transmission over

1 month ago

How Many Cores are the High Voltage Copper Cables Normally? What Are the Applications?

High voltage copper cables are essential components in the distribution and transmission of electrical power,…

2 months ago

What Are the High Voltage Lines Used in the Railroad System?

Railroad high voltage lines play a vital role in powering the railway systems that transport

3 months ago

What is the Difference Between Single-Mode and Multimode Fiber Optic Cables?

Fiber optic cables are critical components in modern communication networks, enabling high-speed data transmission over

3 months ago