翻译


+86-371-67829333

消息

埃及电信将接入 2Africa 海底电缆系统

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1)

Telecom Egypt and AquaComms have signed an agreement covering the landing and services of Egypt’s 2Africa fiber optic system, which AquaComms has named Europe Middle East India Connect-1 (EMIC-1).

According to the introduction, EMIC-1 will land in Las Galeb in the Red Sea and Port Said in the Mediterranean, with the two landing stations connected by two different land routes. The new path is adjacent to the Suez Canal (between Suez and Port Said).

此外, Telecom Egypt is developing a third new sea lane, the Red Sea Festoon, connecting Las Galeb and the Suez landing station, while considering a land link between Port Said and Suez along the Suez Canal – Al Morshedeen System.

When completed, the 45,000-kilometer 2Africa submarine fiber optic network system is expected to be the longest submarine network in the world, connecting 46 locations in Africa, Europe and Asia.

The system is expected to come online in 2023/2024, with key parts of the system designed to have a capacity of 180Tbps.

2Arica fiber optic system

The 2Africa submarine cable is a collaboration between China Mobile International Corporation, Facebook, MTN Global Connect, 橙子, STC, Telecom Egypt, Vodafone and WIOCC (East Coast Cable Consortium).

It is the most comprehensive submarine cable serving the African continent and the Middle East, and will also link East Africa and other submarine cables, expanding connections to Asia.

The 2Africa submarine cable has a total length of 37,000 kilometers and will connect Europe (through Egypt to the east), 中东地区 (through Saudi Arabia) 和 16 African countries (Congo, Côte d’Ivoire, Djibouti, Congo, Egypt, Gabon, Ghana, 肯尼亚, Madagascar, 21 landing sites in Mozambique, Nigeria, Sudan, Senegal, Somalia, Tanzania and South Africa), is one of the largest submarine cable projects in the world.

2Africa provides much-needed internet capacity and reliability across much of Africa, compensating for rapidly growing capacity needs in the Middle East and supporting further growth in 5G and fixed broadband access.

According to plans, the project will be completed and commissioned in late 2023 or early 2024, and upon delivery will provide the continent with “significantly higher” capacity than all current existing cables combined.

ZMS 电缆 F

Recent Posts

H05RR-F有什么区别 & H05RN-F & 橡胶电缆中的H07RN-F?

在为电气工程项目选择正确的橡胶电缆时, it is critical to

22 hours ago

春节快乐! - ZMS电缆

亲爱的合作伙伴和客户: 1月29日, 2025 是中国农历新年 – Spring

2 months ago

裸铜线和漆包铜线有什么区别?

铜线是电气工程和电子领域的基本组成部分, valued

2 months ago

郑重声明 & 公告——ZMS电缆

致所有客户及合作伙伴的公告, 最近, there has been sufficient evidence that other

2 months ago

2025 新年快乐!

值此新年之际 2025, ZMS Cable wishes every customer and partner a

3 months ago

欧洲医用光纤市场需求强劲

近年来欧洲医疗行业取得了显着进步, driven by the integration

4 months ago